Poultry Processing Red Water Chiller in Chilling System

Product Details
Customization: Available
Warranty: 12months After Commercial Running or 18months
Type: Water-Cooled

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
49
Year of Establishment
2001-08-01
  • Poultry Processing Red Water Chiller in Chilling System
  • Poultry Processing Red Water Chiller in Chilling System
  • Poultry Processing Red Water Chiller in Chilling System
  • Poultry Processing Red Water Chiller in Chilling System
Find Similar Products

Basic Info.

Model NO.
Bingshan
Cooling Method
Water-cooled
Unit Structure
Integral
Selected Voltage
380V/50HZ
Compressor Number
1
Noise Level
Ultra Low
Application Fields
Food Processing
Condition
New
Temperature
0.3~1 Deg.C
Refrigerant
R717/R22/R404A/R507
Application
Petro-Chemical Industry, Food Industry
Line Capacity
2000-13500 Birds/H
Transport Package
Packing in Wooden Cases
Trademark
BINGSHAN
Origin
China
HS Code
841869
Production Capacity
100

Product Description

Red Water Chiller Introduction
Red Water Chiller is mainly used for red water circulation cooling of carcasses produced by poultry slaughtering line or chicken slaughterhouses (2000-13500birds/h). By adopting ejecting liquid supply technology, the structure design of falling film shell and tube heat exchanger, careful selection of control elements, and rigorous setting of the control program, Red Water Chiller can provide stable and reliable ice water at about 0.3~1ºC.
To fully guarantee the chicken water's reasonable, pre-cooling time, poultry ketone body can be cooled to below 4 ºC; At the same time, the low water temperature effectively inhibited microbial reproduction. The quality of chilled products is good, the quick freezing heat load is greatly reduced.

 

Red Water Chiller

The BINGSHAN Red Water Chiller provides cold water for poultry processing and cooling. We can guarantee cool water temperature and prevent tube leaks.

 

·Reliability 

Red Water Chiller Guaranteed 0.3°C water temperature of re-chiller outlet. 

Refrigerant injectors eliminate the need for high-maintenance ammonia pumps. 

 

·Efficient 

Poultry Chiller Precise temperature control via a modulating pressure regulator. 

Adopt a falling film evaporator, with high-effective heat transfer, and low ammonia charging. 

Maintains the highest water flow for more water exchange in the Red Water Chiller and effectively avoids ice blockage. 

 

·Accessible Design 

Red Water Chiller critical components are easily accessible outside the unit. 

Removable U-bends facilitate full inspection and cleaning of all surfaces. 

 

·Premium Construction 

Food-grade stainless steel frame, jacketing, process tubing, U-bends, and tube sheets. 

 

·Easy Controls 

Easy operation via HMI touch-screen controls. Monitor temperature and pressure, change control points, initiate freeze protection parameters and vary evaporator pressures based on load requirements

Poultry Processing Red Water Chiller in Chilling System
Red Water Chiller Technical Processing
Poultry Processing Red Water Chiller in Chilling System

Advantage

1. Energy saving -- the temperature before quick-freezing is cooled from 20-10ºC to 4ºC, and the heat load of this part is turned to -7ºC directly.  -25 ~ -30 ºC flake ice system is upgraded to -7ºC, with a total energy saving of over 51%

2. Water saving - pre-cooling water is cooled and circulated. Innovates the pre-cooling water cooled through the flake ice and decreases water consumption. 

3. Hygiene - food machinery design, CIP automatic cleaning, multiple cleaning technology

4. Fresh-keeping -- Together with the screw pre-cooling machine, the poultry meat center temperature can be quickly cooled to +4ºC to meet the requirement

To improve quality, poultry chilled products' shelf life is extended by one time.

5. Labor-saving - high cooling efficiency, simple operation, shorten the working time of all staff

 

Specification

 

Standard Products

Ref. Cap. (kw)

Water Flow (t/h)

L x W x H (m)

Net Weight (KG)

HSMA300

300

160

5.1*1.6*2.1

3400

HSMA450

450

160

6.6*1.6*2.1

3900

HSMA600

600

180

8.1*1.6*2.2

4500

HSMA750

750

180

9.6*1.6*2.2

5200

HSMA900

900

230

6.6*2.0*2.7

7000

HSMA1200

1200

230

8.1*2.0*2.7

8400

 

Poultry Processing Red Water Chiller in Chilling System

Poultry Processing Red Water Chiller in Chilling System

Bingshan Group was founded in 1930(Investment by Panasonic & Chinese Goverment), there are 43 enterprises, which include 1 public company, 9 subsidiary enterprises (domestically funded enterprises), and 32 Sino-foreign joint ventures. Bingshan Group has total assets of 9.5 billion RMB and 12000 contracted employees.  It's China's largest manufacturing base of refrigeration and air-conditioning equipment, agricultural deep processing equipment base, and one of the main bases of China's petrochemical general machinery equipment.

 

Dalian Bingshan Engineering & Trading Co., Ltd. (Hereafter referred to as BSET) is jointly funded professional trading company by Dalian Bingshan Group Co., Ltd and Dalian Refrigeration Co., Ltd. in 1988. Concentrating on consulting, design, sales. 

BSET provides quality products to different application fifields including fruit and vegetable, meat and poultry, seafood, beverage etc processing and freezing & refrigerating fifield etc. 

BSET has undertaken hundreds of turnkey projects in Asia, Africa, America etc. more than 60 countries and regions, as well as offer customized energy optimization and sustainable cold chain solutions. 

 

Poultry Processing Red Water Chiller in Chilling System

Poultry Processing Red Water Chiller in Chilling SystemMain Application

Heating Ventilation Central Air Conditioning

Industrial Refrigeration

Food Refrigeration

Trading & Service

OEM & PART

 

Main Products

Screw Compressor Unit Series

Piston Compressor Unit Series

LiBr Absorption Chiller Series

Condenser and Cooling Tower Series

Evaporator Series

Quick Freezer Series

Commercial VRF Series, Air Handling Unit Series, Terminal Equipment Series
 

Poultry Processing Red Water Chiller in Chilling System

 

 

Poultry Processing Red Water Chiller in Chilling System
Poultry Processing Red Water Chiller in Chilling System
Poultry Processing Red Water Chiller in Chilling System


FAQ:

Q1.What is our main product ?

A1: Our company is a professional trading company funded by Dalian Refrigeration Co., Ltd. in 1988. Concentrate on consulting, design, sales, installation, commissioning and maintenance of the refrigeration equipments.

 

Q2.When can I get the price ?

A2:We usually offer the quotation within 2-3 work days for equipment and 5-10 work days for system after receiving your inquiry. For urgent offer, please contact with us for special.  

 

Q3.What is the Trade Term?

A3: We accept Ex-work factory , FOB Dalian, CNF or CIF, as your requirement. 

 

Q4.How long is our Production leading time?

A4: It depends on type of equipment.

For cold storage equipment, the lead time is 60-80days after receiving down payment or Letter of credit.

For Spiral Freezer, Tunnel Freezer, the lead time is 80-90days after receiving down payment or Letter of credit.

For flake ice making unit and plate freezer, the lead time is 45days after receiving down payment or letter of credit.

 

Q5.What is the Payment term?

A5: By 100% T/T before shipment or By L/C at sight.

 

Q6. During shipping, if there is a damage to products, how do you get replacement?

A6: Firstly, we should investigate the reason cause the damage. At the same time, we will claim for the insurance by ourselves or assist the buyer.

Secondly we will send the replacement to the buyer. The responsible person for above damage will take charge of the cost of the replacement.

 

Q7. What are your terms of packing?

A7: Packing: export worthy package suitable for container transportation.

 

Q8. Do you test all your goods before delivery?

A8: Yes, we have 100% test before delivery.

 

Q9: How do you make our business long-term and good relationship?

A9: Dalian Refrigeration Co., Ltd was established on 1930. In past 88 years, we have set up our famous brand "Bingshan" not only in domestic market but also overseas market. How to make this brand life so long time?  Good quality and reliable service create good reputation among the customers. Many customers keep adopting our system in past 20days extension of the business. Win-win business is our main task for the long-term cooperation.

 

Q10: Are you a factory or a trading company?

A10: We are the only door to overseas market for Dalian Refrigeration Co., Ltd. We have our own design team, installation team and after-sales team. We are professional engineering & trading company. We have set up branch office in Philippines, Malaysia, Thailand, Burma, Cambodia, Singapore, Bangladesh, Pakistan, Russian, Uzbekistan, Brazil, Argentina etc.

 

Q11: Where is your factory located?

A11: Our factory is located in Dalian, Liaoning province 

 

Q12: What is your warranty?

A12Warranty: 12months after commercial running or 18months from the date of shipment, subject to the earlier expiry.

 

Q13: Can you arrange thirty party pre-shipment inspection

A13: Pre-shipment inspection: Supplier's pre-shipment inspection is Final; pre-shipment inspection by third Party on buyers cost.

 

Q14:Can we do our OEM logo?
A14:Yes, for the products with drawing supplied by you, we of course apply your logo

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier