High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller

Product Details
Customization: Available
Warranty: 12months After Commercial Running or 18months
Lubrication Style: Lubricated
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
49
Year of Establishment
2001-08-01
  • High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller
  • High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller
  • High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller
Find Similar Products

Basic Info.

Cooling System
Oil Cooling
Power Source
AC Power
Cylinder Position
Horizontal
Structure Type
Open Type
Installation Type
Stationary Type
Type
Single Screw Compressor
Temperature
-70~+20deg.C
Cooling Capacity
0~18000kw
Refrigerant
R717/R22/R404A/R507
Application
Petro-Chemical Industry, Food Industry
Transport Package
Packing in Wooden Cases
Trademark
BINGSHAN
Origin
China
HS Code
841869

Packaging & Delivery

Package Size
600.00cm * 300.00cm * 300.00cm
Package Gross Weight
1500.000kg

Product Description

Applicant
YSLGF series brine screw chiller adopts new series screw compressor unit, with high[1]efficiency shell-and-tube heat exchanger, having the advantages of high energy efficiency ratio, smooth and reliable operation and etc. Adopt automatic power control device and safety protection device, simple operation , safe and reliable running. Widely used in petroleum, chemical industry, coal, textile, medicine, seafood, commerce, food industry, scientific research, and the place needing artificial refrigeration.


Features
★According to the different working condition equipped different size and structure motor, evaporator, condenser, throttle mechanism, unit is always in the best running state
★Adopt high-efficiency horizontal oil separator, having more outstanding separation effect.
★Condenser adopt high-efficiency heat-exchange tube applied by American individual enterprise Woverine, having high reliability Evaporator tube adopt copper-nickel tube applied by American individual enterprise Woverine, ensure brine side safety
★Heat exchanger has small volume, light weight and the heat exchange efficiency is
better.
★Throttle mechanism and dry filter adopt danfoss from Denmark, with high reliability Unit sets refrigerant capacity automatic regulating device, 10~100% capacity stepless adjustment, achieving the goal of the economic and energy saving
★Unit sets suction pressure low protection, discharge pressure high protection, discharge temperature high protection, cooling water outlet temperature low protection, cooling water flow rate low protection and etc. in order to prevent the unit operation failure, protecting the unit reliable operation.
★High intelligent electrical control, British GUARDIAN international control company integrates the advantages of many refrigeration companies in Europe and the United States, according to the characteristics of the units to develop dedicated microcomputer controller. Running faster, higher reliability and stronger control function, implement modularization and networking.


YSLGF Series Brine Screw compressor Unit Specification& Data

Item
Unit
YSLG12.5F(Z) JYSLG12.5F(Z) YSLG16F(Z) JYSLG16F(Z) YSLG20F(Z) JYSLG20F(Z)
Refrigerant   R22

Brine outlet temp. range
c -10 -15 -10 -15 -10<ts0 -20<ts-10 -25<ts-20 -10<ts0 -20<ts-10 -25<ts-20 -30<ts-25 -35sts-30

Refrigeration Capacity
kw 120 120 263 265 680 565 365 810 680 460 372 228

Refrigerant Charge
kg 100 180 180 180 400

First charging oil
kg 130 220 220 220 400
Economizer   No Yes No Yes No Yes




Compressor

Model
  LG12.5 LG16 LG20

Rotate Speed
r/min 2960

Capacity Adjustable Range

%

10-100 Stepless Adjustment


Motor
Power kw 55 65 125 125 250 220 200 250 250 220 220 200
Power Supply   3P,50Hz,380V
Oil Pump Motor Power kw 2.2 3 3
Power Supply   3P,50Hz,380V






Evaporator

Brine Inlet & Outlet Temp.
c -10 -15 -10 -15 -5 -10 -20 -5 -10 -20 -25 -35

Brine Resistance
Mpa s0.07

Brine Flow
m3/h 24 24 52 53 132 112 74 157 135 94 76 48

Brine Inlet & Outlet Pipe
mm 80 80 100 100 150 150 150 150 150 150 150 150

Brine Mass Concentration
% 20.9 21.5 20.9 22.5 17 20.9 24.8 17 20.9 24.8 25.7 28




Condenser

Cooling Water Resistance
MPa s0.07

Cooling Water Flow
m3/h 32 34 70 73 142 120 80 170 145 103 86 55

Cooling water inlet&outlet caliber

mm

80

80

125

125

150

150

150

150

150

150

150

150



Outline Dim.
L (mm) mm 3000 3000 3320 3320 4780 3960
w (mm) mm 1810 1830 1954 1820 2560 2560
H (mm) mm 1850 1850 2000 1950 2550 2550
Weight kg 3500 4300 5000 5400 9220 9110 9020 8630 8530 8530 8450 8450


 

High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller

Bingshan Group was founded in 1930(Investment by Panasonic & Chinese Goverment), there are 43 enterprises, which include 1 public company, 9 subsidiary enterprises (domestically funded enterprises), and 32 Sino-foreign joint ventures. Bingshan Group has total assets of 9.5 billion RMB and 12000 contracted employees.  It's China's largest manufacturing base of refrigeration and air-conditioning equipment, agricultural deep processing equipment base, and one of the main bases of China's petrochemical general machinery equipment.

 

Dalian Bingshan Engineering & Trading Co., Ltd. (Hereafter referred to as BSET) is jointly funded professional trading company by Dalian Bingshan Group Co., Ltd and Dalian Refrigeration Co., Ltd. in 1988. Concentrating on consulting, design, sales. 

BSET provides quality products to different application fifields including fruit and vegetable, meat and poultry, seafood, beverage etc processing and freezing & refrigerating fifield etc. 

BSET has undertaken hundreds of turnkey projects in Asia, Africa, America etc. more than 60 countries and regions, as well as offer customized energy optimization and sustainable cold chain solutions. 

 

High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller

High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water ChillerMain Application

Heating Ventilation Central Air Conditioning

Industrial Refrigeration

Food Refrigeration

Trading & Service

OEM & PART

 

Main Products

Screw Compressor Unit Series

Piston Compressor Unit Series

LiBr Absorption Chiller Series

Condenser and Cooling Tower Series

Evaporator Series

Quick Freezer Series

Commercial VRF Series, Air Handling Unit Series, Terminal Equipment Series
 

High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller

 

 

High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller
High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller
High Efficiency HVAC Cooling System Water-Cooled Industrial Screw Water Chiller


FAQ:

Q1.What is our main product ?

A1: Our company is a professional trading company funded by Dalian Refrigeration Co., Ltd. in 1988. Concentrate on consulting, design, sales, installation, commissioning and maintenance of the refrigeration equipments.

 

Q2.When can I get the price ?

A2:We usually offer the quotation within 2-3 work days for equipment and 5-10 work days for system after receiving your inquiry. For urgent offer, please contact with us for special.  

 

Q3.What is the Trade Term?

A3: We accept Ex-work factory , FOB Dalian, CNF or CIF, as your requirement. 

 

Q4.How long is our Production leading time?

A4: It depends on type of equipment.

For cold storage equipment, the lead time is 60-80days after receiving down payment or Letter of credit.

For Spiral Freezer, Tunnel Freezer, the lead time is 80-90days after receiving down payment or Letter of credit.

For flake ice making unit and plate freezer, the lead time is 45days after receiving down payment or letter of credit.

 

Q5.What is the Payment term?

A5: By 100% T/T before shipment or By L/C at sight.

 

Q6. During shipping, if there is a damage to products, how do you get replacement?

A6: Firstly, we should investigate the reason cause the damage. At the same time, we will claim for the insurance by ourselves or assist the buyer.

Secondly we will send the replacement to the buyer. The responsible person for above damage will take charge of the cost of the replacement.

 

Q7. What are your terms of packing?

A7: Packing: export worthy package suitable for container transportation.

 

Q8. Do you test all your goods before delivery?

A8: Yes, we have 100% test before delivery.

 

Q9: How do you make our business long-term and good relationship?

A9: Dalian Refrigeration Co., Ltd was established on 1930. In past 88 years, we have set up our famous brand "Bingshan" not only in domestic market but also overseas market. How to make this brand life so long time?  Good quality and reliable service create good reputation among the customers. Many customers keep adopting our system in past 20days extension of the business. Win-win business is our main task for the long-term cooperation.

 

Q10: Are you a factory or a trading company?

A10: We are the only door to overseas market for Dalian Refrigeration Co., Ltd. We have our own design team, installation team and after-sales team. We are professional engineering & trading company. We have set up branch office in Philippines, Malaysia, Thailand, Burma, Cambodia, Singapore, Bangladesh, Pakistan, Russian, Uzbekistan, Brazil, Argentina etc.

 

Q11: Where is your factory located?

A11: Our factory is located in Dalian, Liaoning province 

 

Q12: What is your warranty?

A12Warranty: 12months after commercial running or 18months from the date of shipment, subject to the earlier expiry.

 

Q13: Can you arrange thirty party pre-shipment inspection

A13: Pre-shipment inspection: Supplier's pre-shipment inspection is Final; pre-shipment inspection by third Party on buyers cost.

 

Q14:Can we do our OEM logo?
A14:Yes, for the products with drawing supplied by you, we of course apply your logo

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now