Customization: | Available |
---|---|
Warranty: | 12months After Commercial Running or 18months |
Lubrication Style: | Lubricated |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application
Reciprocating compressors are widely applied in marine food low-temperature processing, refrigerated shipment, and air conditioning under the condition of less than or equal to 40C of condensing temp, evaporative temp of+5C ~-30C for single-stage, and -25C ~-45C for dual-stage.
Marine super-low temp. the reciprocating compressor could be reached -70 C of evaporative temp at the lowest, which could be applied in super-low temp freezing and refrigerating system, such as tuna processing, etc.
Features
* Marine reciprocating compressors include three models, single-stage, single dual-stage, and super-low temp.
* All of them belong to high-speed, multi-cylinder, and counter1ow type compressors.
* The unit is equipped with a capacity adjustment device to realize no-load starting, equipped with an oil charge/discharge valve to make it possible to charge lubrication oil in running condition.
* The compressor package unit is composed of compressor, motor, control board, etc.
* Besides that, the single dual-stage compressor is equipped with an intercooler as well.
* All units are equipped with high efficient oil separator and auto oil return device.
* Above elements are mounted in a common base.
* The control board includes high and middle-pressure relay, oil pressure relay, which could protect the compressor to be safe and reliable.
* To ensure reliability during the voyage, all the marine reciprocating compressors should be tested on a swinging experimental bench
Marine Reciprocating Compressor Unit Technology Parameter Table
Model Unit |
CYF4F2V10 | CYF6F2w10 | CYF8F2S10 | CYF4F2SJ10 | YF18F2SJ10 | CHS2F2Z10 | CJZT810C |
|
Refrigerant |
R22 |
|||||||
work Condition |
C |
-15/30 |
-35/35 |
-5/40 |
-35/35 |
|||
Unit Ref. Cap. |
kw |
52.3 |
81.4 |
104 |
18.3 |
36.6 |
51.2 |
54.4 |
Type |
Open Type |
|||||||
Compressor Model |
4F2V10 |
6F2w10 |
8F2S10 |
4F2SJ10 |
8F2SJ10 |
2F2Z10 |
T810C |
|
Compressor Theoretical Volume |
m3/h |
126.6 |
190 |
253.3 |
High stage 31.65 |
High stage 63.3 |
63.3 |
High stage 90.4 |
Low stage 94.95 |
Low stage190 |
Low stage272 |
||||||
Cap. Regulating Range |
0,1/2,1 |
0,1/3,2/3,1 |
0,1/4,1/2,3/4,1 |
0,1/3,2/3,1 |
0,1/3,2/3,1 |
0,1/3,2/3,1 |
||
Power |
V |
220V/50Hz,380V/50Hz |
||||||
Motor Type and Power |
kw |
YH200L2-6/22 |
YH250M-6/37 |
YH280S-6/45 |
YH200L1-6/18.5 |
YH225M-6/30 |
YH180L-6/15 |
YH250M-6/37 |
Starting Cabinet |
CYF4F2SJ10-G |
CYF4F2SJ10-G |
8F2SJ10-CG |
CHS2F2Z10-ZT |
CJZT810C-G |
|||
Revolution |
r/min |
960 |
||||||
Suction Pipe Dia. |
mm |
50 |
65 |
100 |
High stage 32 |
High stage 40 |
50 |
High stage 60 |
Low stage 50 |
Low stage 65 |
Low stage 80 |
||||||
Discharge Pipe Dia |
mm |
50 |
65 |
80 |
High stage 32 |
High stage 40 |
40 |
High stage 50 |
Low stage 50 |
Low stage 65 |
Low stage 60 |
||||||
Crankshaft Box oil Cap. |
kg |
12 |
15 |
15 |
8 |
15 |
8.5 |
20 |
Unit Weight |
kg |
1130 |
1450 |
1675 |
1124 |
1655 |
3100 |
1836 |
Outline( XX) (LxWxH) |
mm |
1920x950x1350 |
2065x1175x1320 |
2225×1285×1475 |
2075x960x1535 |
2300x1010x1520 |
2110x1020x1300 |
2048x1073x1204 |
Remark |
Equipped with intercooler |
Equipped with direct-cooler |
Model Unit |
CJZT810CD |
CJZS812.5-1 |
CJZS812.5C |
CJZS812.5CDW |
CJZ812.5 |
CYF612.5 |
CYF412.5 |
|
Refrigerant |
R22 |
|||||||
work Condition |
C |
-35/35 |
-60/35 |
+5/40 |
-15/35 |
-15/30 |
||
Unit Ref. Cap. |
kw |
54.4 |
93.31 |
102.64 |
22.41 |
470 |
169.3 |
120 |
Type |
Open Type |
|||||||
Compressor Model |
T810C |
CS812.5 |
CS812.5C |
CS812.5CDW |
812.5-1 |
612.5-1 |
412.5-1 |
|
Compressor Theoretical Volume |
m3/h |
High stage 90.4 |
High stage 141 |
High stage 155 |
High stage 155 |
565 |
424 |
283 |
Low stage272 |
Low stage 424 |
Low stage 466 |
Low stage 466 |
|||||
Cap. Regulating Range |
0,1/3,2/3,1 |
0,1/3,2/3,1 |
0,1/3,2/3,1 |
0,1/3,2/3,1 |
0,1/4,1/2,3/4,1 |
0,1/3,2/3,1 |
0,1/2,1 |
|
Power |
V |
220V/50Hz,380V/50Hz |
||||||
Motor Type and Power |
kw |
Y280T-6/37 |
Y-H315S-6/75kw |
132 |
75 |
55 |
||
Starting Cabinet |
CJZT810C-G |
CJZS812.5-G220/ CJZS812.5-G380 |
||||||
Revolution |
r/min |
960 |
||||||
Suction Pipe Dia. |
mm |
80 |
Low stage 125 |
125 |
100 |
80 |
||
Discharge Pipe Dia |
mm |
50 |
High stage 65 |
100 |
80 |
65 |
||
Crankshaft Box oil Cap. |
kg |
20 |
40 |
40 |
40 |
40 |
37 |
37 |
Unit Weight |
kg |
1719 |
2800 |
2850 |
3425 |
2680 |
2050 |
|
( XX) Outline (LxWxH) | mm |
1612x1040x1036 |
2660x1350x1560 |
2660x1400x1700 |
2600x1650 x1644 |
2500x1550x1420 |
2300x1450x1400 |
|
Remark |
Equipped with intercooler |
Bingshan Group was founded in 1930(Investment by Panasonic & Chinese Government), there are 43 enterprises, which include 1 public company, 9 subsidiary enterprises (domestically funded enterprises), and 32 Sino-foreign joint ventures. Bingshan Group has total assets of 9.5 billion RMB and 12000 contracted employees. It's China's largest manufacturing base of refrigeration and air-conditioning equipment, agricultural deep processing equipment base, and one of the main bases of China's petrochemical general machinery equipment.
Dalian Bingshan Engineering & Trading Co., Ltd. (Hereafter referred to as BSET) is a jointly funded professional trading company by Dalian Bingshan Group Co., Ltd and Dalian Refrigeration Co., Ltd. in 1988. Concentrating on consulting, design, sales.
BSET provides quality products to different application fields including fruit and vegetable, meat and poultry, seafood, beverage etc processing and freezing & refrigerating fifield etc.
BSET has undertaken hundreds of turnkey projects in Asia, Africa, America etc. more than 60 countries and regions, as well as offer customized energy optimization and sustainable cold chain solutions.
Main Application
Heating Ventilation Central Air Conditioning
Industrial Refrigeration
Food Refrigeration
Trading & Service
OEM & PART
Main Products
Screw Compressor Unit Series
Piston Compressor Unit Series
LiBr Absorption Chiller Series
Condenser and Cooling Tower Series
Evaporator Series
Quick Freezer Series
Commercial VRF Series, Air Handling Unit Series, Terminal Equipment Series
Q1.What is our main product?
A1: Our company is a professional trading company funded by Dalian Refrigeration Co., Ltd. in 1988. Concentrate on consulting, design, sales, installation, commissioning, and maintenance of the refrigeration equipment.
Q2.When can I get the price?
A2:We usually offer the quotation within 2-3 workdays for equipment and 5-10 workdays for the system after receiving your inquiry. For urgent offer, please contact with us for special.
Q3.What is the Trade Term?
A3: We accept Ex-work factory , FOB Dalian, CNF or CIF, as your requirement.
Q4.How long is our Production leading time?
A4: It depends on type of equipment.
For cold storage equipment, the lead time is 60-80days after receiving down payment or Letter of credit.
For Spiral Freezer, Tunnel Freezer, the lead time is 80-90days after receiving down payment or Letter of credit.
For flake ice making unit and plate freezer, the lead time is 45days after receiving down payment or letter of credit.
Q5.What is the Payment term?
A5: By 100% T/T before shipment or By L/C at sight.
Q6. During shipping, if there is a damage to products, how do you get replacement?
A6: Firstly, we should investigate the reason cause the damage. At the same time, we will claim for the insurance by ourselves or assist the buyer.
Secondly we will send the replacement to the buyer. The responsible person for above damage will take charge of the cost of the replacement.
Q7. What are your terms of packing?
A7: Packing: export worthy package suitable for container transportation.
Q8. Do you test all your goods before delivery?
A8: Yes, we have 100% test before delivery.
Q9: How do you make our business long-term and good relationship?
A9: Dalian Refrigeration Co., Ltd was established on 1930. In past 88 years, we have set up our famous brand "Bingshan" not only in domestic market but also overseas market. How to make this brand life so long time? Good quality and reliable service create good reputation among the customers. Many customers keep adopting our system in past 20days extension of the business. Win-win business is our main task for the long-term cooperation.
Q10: Are you a factory or a trading company?
A10: We are the only door to overseas market for Dalian Refrigeration Co., Ltd. We have our own design team, installation team and after-sales team. We are professional engineering & trading company. We have set up branch office in Philippines, Malaysia, Thailand, Burma, Cambodia, Singapore, Bangladesh, Pakistan, Russian, Uzbekistan, Brazil, Argentina etc.
Q11: Where is your factory located?
A11: Our factory is located in Dalian, Liaoning province.
Q12: What is your warranty?
A12: Warranty: 12months after commercial running or 18months from the date of shipment, subject to the earlier expiry.
Q13: Can you arrange thirty party pre-shipment inspection
A13: Pre-shipment inspection: Supplier's pre-shipment inspection is Final; pre-shipment inspection by third Party on buyers cost.
Q14:Can we do our OEM logo?
A14:Yes, for the products with drawing supplied by you, we of course apply your logo